Geotechnical Investigation, Detailed Design and Slope Stabilization Measure for Unstable Roadside Slope at Tulsi Bhanjyang, Siddhartha Highway, Nepal

Project: Geotechnical Investigation, Detailed Design and Slope Stabilization Measure for Unstable Roadside Slope at Tulsi Bhanjyang, Siddhartha Highway, Nepal

Client: Department of Roads

Year: 2025

Status: Completed

GEOINFRA was responsible for conducting a detailed geotechnical investigation and preparing slope stabilization designs for a vulnerable roadside slope section. The major tasks completed include: